Substation micrositing

 

Where the substation is located within the wind farm has a big impact on the inter-array cable layout and influences the overall cost of the cable system. This is not trivial when taking into account the typically non-linear seabed conditions and electrical characteristics of the cables. Only an extensive search of possible substation locations will return the greatest value solution. The speed of the Kinewell Energy's KLOC software makes this possible.